PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
3.68 M
(max 9.34 M)
IN
12.45 M
(max 19.14 M)
OUT
16.13 M
(max 24.68 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC