PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
2.09 M
(max 19.34 M)
IN
5.79 M
(max 27.82 M)
OUT
7.88 M
(max 30.2 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC