PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
0.18 M
(max 6.21 M)
IN
3.29 M
(max 20.51 M)
OUT
3.47 M
(max 20.66 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC