PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
3.26 M
(max 16.68 M)
IN
14.01 M
(max 34.16 M)
OUT
17.27 M
(max 40.18 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC