PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
1.95 M
(max 19.34 M)
IN
6.54 M
(max 27.82 M)
OUT
8.49 M
(max 30.2 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC