PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
7.11 M
(max 16.68 M)
IN
11.53 M
(max 34.16 M)
OUT
18.64 M
(max 40.18 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC