PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
1.68 M
(max 8.31 M)
IN
5.94 M
(max 15.52 M)
OUT
7.62 M
(max 20.69 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC