PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
1.92 M
(max 9.34 M)
IN
11.67 M
(max 19.14 M)
OUT
13.59 M
(max 24.68 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC