PEER: INTEGRASI LOGISTRIK CIP 10GE1-0-22
0.48 M
(max 18.60 M)
IN
5.22 M
(max 327.98 M)
OUT
5.70 M
(max 328.44 M)
TOTAL
DAILY PEAK TRAFFIC
MONTHLY PEAK TRAFFIC